HCW Hollywood Concrete logoHCW Hollywood Concrete

Concrete Driveways

Durable, attractive driveways built to last for decades in Hollywood, FL.

Professional concrete driveway installation by Hollywood concrete contractors

Why Choose Concrete for Your Driveway

Your driveway is one of the most used surfaces on your property. It needs to handle the weight of your vehicles, resist Florida's intense heat and occasional storms, and still look great year after year. Concrete driveways deliver on all these requirements better than any other material.

Here in Hollywood, FL, we see our fair share of extreme weather. Concrete stands up to these conditions without cracking, fading, or deteriorating the way asphalt does. While asphalt driveways start to break down after just a few years under our hot sun, a properly installed concrete driveway can last 30 years or more with minimal maintenance. That's a significant long-term investment in your property's value.

The upfront cost of concrete is higher than asphalt, but when you factor in the longevity and low maintenance requirements, concrete actually saves you money over time. You won't need to reseal it every few years or worry about oil stains permanently marking the surface. Concrete is also better for the environment since it doesn't require petroleum-based products and reflects heat rather than absorbing it.

Our Driveway Installation Process

The key to a driveway that lasts is proper installation from the ground up. We don't rush through any steps, and we don't cut corners. Here's how we make sure your driveway is built right:

Site Preparation and Grading

Everything starts with the ground beneath your driveway. We excavate to the proper depth, remove any organic material that could decompose and cause settling, and grade the area to ensure proper drainage. In Florida, drainage is critical. We make sure water flows away from your home and doesn't pool on your driveway surface.

Base Installation

We install a compacted gravel base that provides a stable foundation for your concrete. This base prevents settling and cracking by distributing the weight of your vehicles evenly. The thickness of the base depends on your soil conditions and the expected load, but we never skimp on this crucial layer.

Pouring and Finishing

We use high-quality concrete mix specifically formulated for Florida's climate. The concrete is poured to the proper thickness (typically 4 to 6 inches for residential driveways), reinforced with steel or fiber mesh for added strength, and finished with control joints to manage cracking. Our finishing techniques ensure a smooth, attractive surface with just enough texture for traction.

Driveway Options and Customization

Concrete driveways don't have to be plain gray slabs. We offer several options to enhance the appearance of your driveway and match your home's style:

  • Brushed finish: The standard, practical option with good traction and a clean appearance
  • Exposed aggregate: Reveals decorative stone in the concrete for texture and visual interest
  • Stamped patterns: Mimics the look of brick, stone, or pavers at a fraction of the cost
  • Colored concrete: Adds integral color or stain for a unique look that won't fade
  • Scored patterns: Creates geometric designs or border accents

You can also add features like heated driveways (great for areas with morning dew), decorative borders, or extended areas for RV parking or basketball courts. We'll work with you to design a driveway that meets your practical needs while enhancing your home's curb appeal. If you're also considering outdoor living spaces, check out our concrete patio services.

What to Expect During Installation

We know that having your driveway replaced is a major project. Here's what you can expect when you work with us:

The entire process typically takes 3 to 5 days from start to finish, depending on the size and complexity of your driveway. Day one involves demolition of your old driveway (if applicable) and site preparation. Days two and three focus on base installation and forming. The concrete pour usually happens on day four, and we return on day five for any final touches and to remove forms.

After the pour, your concrete needs time to cure properly. You can walk on it after about 24 hours, but you should wait at least 7 days before driving on it. We'll give you specific instructions for your project. During the curing period, we'll return to apply curing compound and check on the concrete's progress.

We keep your property as clean as possible throughout the project. We use protective barriers to prevent damage to your landscaping, and we clean up thoroughly each day before we leave. Our goal is to minimize disruption to your daily routine while delivering a driveway that exceeds your expectations.

Frequently Asked Questions